Colorado State University Walter Scott Jr. College of Engineering
This project had one simple goal — to create a better world for future generations through education, innovation and infrastructure that reflects the future of
engineering....
Saunders Construction added perforated metal panels to the inside of the building to hide all exposed structural steel. Other upgrades added with the owners savings were: custom polished concrete floor in the front lobby, upgraded office interiors, sandblasted Ram logo in entry and upgraded ceiling and lighting design. Exterior upgrades included large stucco/stone veneer columns on gymnasium and landscaping enhancements.

