CORE Electric Cooperative Pine Junction
The new CORE Electric Cooperative facility in Pine Junction is a new, pre-engineered metal building on a greenfield, mountain site....
Read More →Security Alert: Imposter Posing as CFO Brian Archibald Using Fake Email Domain. Learn more here.
×


The new addition houses a depalletizer and aluminum bottling line. The existing Stark building remained active throughout construction and required air sealed dock doors to allow bottle trucks to create a seal to the building, allowing the pallets to be removed via conveyor systems.
Anheuser-Busch LLC
Farnsworth Group

The new CORE Electric Cooperative facility in Pine Junction is a new, pre-engineered metal building on a greenfield, mountain site....
Read More →
Saunders Norwood worked alongside LKA Partners to build CORE Electric Cooperative, an 8,200 square-foot structural steel addition to their Woodland Park office facility. ...
Read More →
Castle Rock Industrial at the Meadows is the first ever industrial project in Castle Rock and was built on a brand new development site without any utilities....
Read More →