Thompson Valley High School Remodel
Saunders completed the high school remodel over two summers, adding secured vestibules, an upgraded library, and MEP upgrades....
Read More →The facility significantly increased the high density storage capacity and will be a shared resource for University of Colorado and Auraria Higher Education Center. The book storage shelves stand almost three stories high and the facility runs at a constant 55 degrees Fahrenheit with a relative humidity of 35%.
This project was a complex addition on active campus with specific requirements on temperature control, humidification, light levels, penetrations of the existing structure and super flat floor (1/16-inch in 10 foot tolerance). In addition, the Saunders team overcame unforeseen challenges with asbestos in the soil to maintain schedule.