This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.
The iconic Lory Student Center on the Colorado State University (CSU) campus recently underwent a complete revitalization. This $70 million project consists of a 160,000-square-foot renovation with an addition of 40,000 sq. ft. This facility houses a variety of activities allowing for a more modern and organized gathering place for the students and staff. Services include a full ballroom, student dining venues, support services offices, art gallery as well as the Ramskeller microbrewery.
Remaining partially open during construction, the work occurred with a dedicated focus on the safety of everyone on the CSU campus utilizing multiple forms of communication, as well as aligning the construction with the school’s schedule.
The majority of the exterior skin/support was removed and replaced with a more efficient thermal system to meet today’s standards. Additionally, the project included a very complicated utility package, civil/site work, landscaping, high-end exterior concrete hardscapes including site walls with specialty finishes.
Fire codes, building codes, and earthquake zones changed from the time the original building was built resulting in the need to structurally strengthen the existing building. This strengthening involved adding 23 new concrete shearwalls within the existing building’s footprint, and strengthening the existing pier foundations. Construction also included 42,000-square-feet of carbon fiber reinforcing that was applied to the existing concrete, which was the third largest carbon fiber reinforcing operation in the United States. The Student Center’s staff and a dozen Student Organizations were moved during construction by temporarily converting the MAC Gym to modular offices.
Concrete Information:
- 4,200 cubic yards of concrete
- 23 shearwalls
- 42,000 square feet of carbon reinforcing
- Complex, phased construction schedule